APPROXIMATE VALUE - £15M
Development of a brownfield site at Branwhite (off Gainsborough Square) in Bristol, to construct 47 residential units and one commercial unit for Bristol City Council.
The flats will be within one 4 storey and two 3 storey buildings, with the newly adoptable highway bound by a terrace of houses. A high standard of environmental sustainability will be achieved through the provision Air and Ground Source Heat Pumps, Green Roofs and a Fabric First approach. We have designed the highway works, below ground drainage (including SuDS features) as well as the substructure and RC podium deck for the buildings.
EXPECTED COMPLETION DATE - 2026

APPROXIMATE VALUE - £15M
Development of the former cinema site on Filwood Broadway, to construct 30 new affordable homes and 10 shared ownership dwellings, alongside two large units for commercial and community space for Bristol City Council.
The flats and commercial spaces will be within two 4 storey buildings, with the newly adoptable highway flanked by two terraces of houses. A high standard of environmental sustainability will be achieved through the provision Air and Ground Source Heat Pumps, Green Roofs and a Fabric First approach. We have designed the highway works, below ground drainage (including SuDS features) as well as the substructure and RC podium deck for the buildings.
EXPECTED COMPLETION DATE - 2026

APPROXIMATE VALUE - £9M
Extensive refurbishment, structural alterations and extension to derelict building to provide 48 new affordable homes and around 3,900 sq ft of commercial space for Beacon Cymru Group. The proposal includes the addition of two new floors and the demolition of the former garage building to allow the construction of new six storey residential block. The new building will include a green roof along with a full height living green wall within a central atrium. We are providing the Civil and Structural Engineering design services from RIBA Stages 3 – 6.
EXPECTED COMPLETION DATE - 2027

APPROXIMATE VALUE - £6M
A development of contemporary one, two and three bedroom apartments, along with three luxury townhouses in the sought after suburb of Pontcanna. This includes eleven apartments in the newly refurbished Victorian buildings, twenty one new build apartments and townhouses. We provided the Civil and Structural Engineering design services for this scheme.
COMPLETION DATE - 2022

APPROXIMATE VALUE - £25M
This development is located alongside Atlantic Wharf and includes the construction of several mixed use residential blocks that consist of approximately 180 apartments and commercial units. The design included a reinforced concrete structure up to podium level, with lightweight construction above. We provided the Civil and Structural Engineering design services for Blocks C, D and F, as well as the temporary works design.
COMPLETION DATE - 2022


APPROXIMATE VALUE - £15M
Development of a brownfield site at Branwhite (off Gainsborough Square) in Bristol, to construct 47 residential units and one commercial unit for Bristol City Council.
The flats will be within one 4 storey and two 3 storey buildings, with the newly adoptable highway bound by a terrace of houses. A high standard of environmental sustainability will be achieved through the provision Air and Ground Source Heat Pumps, Green Roofs and a Fabric First approach.
We have designed the highway works, below ground drainage (including SuDS features) as well as the substructure and RC podium deck for the buildings.
EXPECTED COMPLETION DATE - 2026


APPROXIMATE VALUE - £15M
Development of the former cinema site on Filwood Broadway, to construct 30 new affordable homes and 10 shared ownership dwellings, alongside two large units for commercial and community space for Bristol City Council.
The flats and commercial spaces will be within two 4 storey buildings, with the newly adoptable highway flanked by two terraces of houses. A high standard of environmental sustainability will be achieved through the provision Air and Ground Source Heat Pumps, Green Roofs and a Fabric First approach.
We have designed the highway works, below ground drainage (including SuDS features) as well as the substructure and RC podium deck for the buildings.
EXPECTED COMPLETION DATE - 2026


APPROXIMATE VALUE - £9M
Extensive refurbishment, structural alterations and extension to derelict building to provide 48 new affordable homes and around 3,900 sq ft of commercial space for Beacon Cymru Group. The proposal includes the addition of two new floors and the demolition of the former garage building to allow the construction of new six storey residential block. The new building will include a green roof along with a full height living green wall within a central atrium. We are providing the Civil and Structural Engineering design services from RIBA Stages 3 – 6.
EXPECTED COMPLETION DATE - 2027


APPROXIMATE VALUE - £6M
A development of contemporary one, two and three bedroom apartments, along with three luxury townhouses in the sought after suburb of Pontcanna. This includes eleven apartments in the newly refurbished Victorian buildings, twenty one new build apartments and townhouses. We provided the Civil and Structural Engineering design services for this scheme.
COMPLETION DATE - 2022


APPROXIMATE VALUE - £25M
This development is located alongside Atlantic Wharf and includes the construction of several mixed use residential blocks that consist of approximately 180 apartments and commercial units. The design included a reinforced concrete structure up to podium level, with lightweight construction above. We provided the Civil and Structural Engineering design services for Blocks C, D and F, as well as the temporary works design.