APPROXIMATE VALUE - £TBC
Construction of a new two storey maintenance depot facility for Network Rail. The building has been designed to be highly energy efficient. The steel frame building has a composite slab at first floor and piled foundations. We provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2021

APPROXIMATE VALUE - £12M
The SQ17 data centre building was designed to accommodate two storeys of data halls and three storeys of office/meeting rooms. The design had to satisfy the high imposed loads and stringent deflection/vibration criteria, meaning steel cellular beams were used. There is a basement car park along with new access roads. We provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2013

APPROXIMATE VALUE - £4.5M
Extension to the existing pharmaceutical warehouse building. The steel frame building had portal frames spanning in excess of 30m. The external works included a new access road and loading areas. We provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2015

APPROXIMATE VALUE - £4M
Design of a new bus terminus with four bays, a covered station building and kiosk for Bridgend County Borough Council. The design incorporated various environmental enhancements, including a green roof, raingarden and amenity space. The development aims to improve public transport links across the region and form part of Porthcawl’s regeneration area. Working with the design and build contractor led team, we provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2024

APPROXIMATE VALUE - £7M
Construction of new two storey technology industry hub on the site of the former steelworks. The building has numerous sustainable features, including a green roof, raingarden and photovoltaic panels. We have provided the RIBA Stage 5 and 6 Civil and Structural Engineering design services for this scheme.
COMPLETION DATE - 2024


APPROXIMATE VALUE - £TBC
Construction of a new two storey maintenance depot facility for Network Rail. The building has been designed to be highly energy efficient. The steel frame building has a composite slab at first floor and piled foundations. We provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2021


APPROXIMATE VALUE - £12M
The SQ17 data centre building was designed to accommodate two storeys of data halls and three storeys of office/meeting rooms. The design had to satisfy the high imposed loads and stringent deflection/vibration criteria, meaning steel cellular beams were used. There is a basement car park along with new access roads. We provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2013


APPROXIMATE VALUE - £4.5M
Extension to the existing pharmaceutical warehouse building. The steel frame building had portal frames spanning in excess of 30m. The external works included a new access road and loading areas. We provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2015


APPROXIMATE VALUE - £4M
Design of a new bus terminus with four bays, a covered station building and kiosk for Bridgend County Borough Council. The design incorporated various environmental enhancements, including a green roof, raingarden and amenity space. The development aims to improve public transport links across the region and form part of Porthcawl’s regeneration area. Working with the design and build contractor led team, we provided the Civil and Structural Engineering design services for this project.
COMPLETION DATE - 2024


APPROXIMATE VALUE - £7M
Construction of new two storey technology industry hub on the site of the former steelworks. The building has numerous sustainable features, including a green roof, raingarden and photovoltaic panels. We have provided the RIBA Stage 5 and 6 Civil and Structural Engineering design services for this scheme.