APPROXIMATE VALUE - £3.5M

Construction of a two storey extension to one of the largest schools in Cardiff. A steel frame structure supported the first floor slab and built-up cladding system to roof. The development included all associated external works and drainage. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2012
APPROXIMATE VALUE - £5.5M

A crescent shaped, split level replacement complex in Llanelli, for Carmarthenshire County Council, with multiple reinforced concrete retaining structures both internally and externally. The building design comprised of a structural steel frame and concrete filled steel frame with concrete filled steel decking to the upper floors, with an insulated standing roof. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2011
APPROXIMATE VALUE - £1.5M

A two storey extension providing new classrooms and library facilities, including a glazed link to the existing college building with associated external works. A second phase of refurbishment works within the existing college building was carried out during the college summer shutdown period. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2012
APPROXIMATE VALUE - £3M

Various sized new buildings and extensions to existing building throughout the university campus, over a two year construction period. We provided the Civil and Structural Engineering design services for this project, which included the foundation solutions, steel frame structures, along with the associated external works and drainage. We also undertook structural surveys of the existing buildings on campus.

COMPLETION DATE - 2009
APPROXIMATE VALUE - £1.2M

Construction of new two storey pavilion, with balconies and state of the art facilities. The glazed front and retractable doors offer unobstructed views of the sports pitches. The design achieved the sustainable targets from the client. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2017
APPROXIMATE VALUE - £3.5M

Construction of a two storey extension to one of the largest schools in Cardiff. A steel frame structure supported the first floor slab and built-up cladding system to roof. The development included all associated external works and drainage. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2012

APPROXIMATE VALUE - £5.5M

A crescent shaped, split level replacement complex in Llanelli, for Carmarthenshire County Council, with multiple reinforced concrete retaining structures both internally and externally. The building design comprised of a structural steel frame and concrete filled steel frame with concrete filled steel decking to the upper floors, with an insulated standing roof. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2011

APPROXIMATE VALUE - £1.5M

A two storey extension providing new classrooms and library facilities, including a glazed link to the existing college building with associated external works. A second phase of refurbishment works within the existing college building was carried out during the college summer shutdown period. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2012

APPROXIMATE VALUE - £3M

Various sized new buildings and extensions to existing building throughout the university campus, over a two year construction period. We provided the Civil and Structural Engineering design services for this project, which included the foundation solutions, steel frame structures, along with the associated external works and drainage. We also undertook structural surveys of the existing buildings on campus.

COMPLETION DATE - 2009

APPROXIMATE VALUE - £1.2M

Construction of new two storey pavilion, with balconies and state of the art facilities. The glazed front and retractable doors offer unobstructed views of the sports pitches. The design achieved the sustainable targets from the client. We provided the Civil and Structural Engineering design services for this project.

COMPLETION DATE - 2017