Transport

   

New Hythe Station, Kent.

A platform replacement at New Hythe Station, Kent. Works included the dismantling

of the original suspended platform and the installation of the new platform utilising

FRP platform units and FRP support members. Also, new lighting and drainage were 

installed and general remedial works were carried out. Designed in association with

Costain Group and Hammond ECS as Contractors.

Shoreham Station, Worthing

The Project entailed the design of the support structure to the new realigned

platform. Along with the design of the remedial works to the existing bridge area of

the platform structure where strengthening was required.

 

Needham Market Station, Suffolk.

The Refurbishment of Needham Market, Suffolk for Abellio Greater Anglia. Included

a replacement platform utilising Dura Rail Deck fixed to FRP composite support 

structure and the design of replacement stair and ramp access to the platforms.

Works also included structural refurbishment of station buildings.

Finchley Road and Frognal Station, London.

Public footbridge refurbishment for Finchley Road and Frognal Station. The project 

included the design and detailing of new footbridge stairs to platforms and design 

of new Pratt trusses to provide support to the deteriorating bridge.  

Brampton Station, Suffolk.

The improvement works to the rural station included the provision of new

reinforced concrete base for the refurbishment of the platform. In conjunction with 

Abellio Greater Anglia and Hammond ECS.