Industrial

 

Data Centre, Wiltshire

The SQ17 Data Centre building was designed to accommodate two storeys of data halls

and three storeys of office and meeting rooms. Externally a basement level car park

and loading area were provided along with new access roads. Constructed in

association with Hale Architects and H.Sweet and Sons as main contractors.

Norgine, Hengoed

Extension to the existing pharmaceutical warehouse. The project consisted of a new    

56m long building with a series of 33m spanning portal frames at 10m high. The

external works consisted of a new 250m long access road along with new marshalling    

yard and loading areas.                                                                                     

      

Firehall & Medical Centre

Provision of a new eight bay fire emergency response centre and two storey medical 

centre. A new helipad, yard area and highway network were also established at the    

Pembrokeshire refinery. This building is currently the largest firehall in Wales. EPT 

Partnership were the architects and Dawnus were the contractors.

 

Hirwaun Fire Station 

New build fire station for South Wales Fire Service. Was erected in the courtyard of the

original station allowing the fire service to have a continuous presence during

construction period. The super-structure comprises of a number of interconnected steel

portal frames, with a partial green roof. Willdig Lammie Partnership were the project

Architects. 

Ebbw Vale, Fire Training Station 

The provision for the design of a rope training tower and high level training platform      

around the existing brickwork fire training tower. South Wales fire service were the

project clients.                                                                                                           

 

Treforest Industrial Estate 

A 17,000 sq.ft warehouse for a high street white goods supplier. A steel portal                 

frame building with composite cladding system was erected on concrete pad and

strip foundation solution following vibro-replacement ground improvement works.              

 

Tondu Waste Transfer Station 

Designed for Bridgend County Borough Council working in conjunction with Rhys             

Davies Services the developer, CLC Design were the architects and Andrew Scott

was the main contractor. This £2 million new waste transfer facility was completed

October 2007. 

Oil Refinery, Pembroke Dock, West Wales

A £3.5 million new stores building for Chevron Oil Refinery. Consisting of a 60 x 55m      

steel frame unit with curved cellular rafter members providing a 9m high stores area

and two storey internal office space.

JTEKT Automotive UK, Resolven, Swansea

A 90,000 sq.ft steel portal frame building, which was to produce essential car

components. Our appointment also included S278 highway works and associated           

drainage design.